Request a quote
Home / Where to measure
Five points on one production line

Where to measure moisture in a concrete plant

Most moisture measurement discussions start at the bin, because that is where fixed sensors go. But material arrives before it reaches the bin, and the moisture it arrives with is the most variable number in the whole process.

Start upstream

The stockpile is the cheapest place to catch a problem

An inline sensor at the silo tells you what the material is doing as it leaves the bin. That is useful, and it is what corrects the batch. But by then the material is already in your plant and already in your inventory.

A portable reading at the stockpile or on the truck at delivery answers a different question: should this material be here at all. Verifying an agreed maximum moisture content on delivery, in real time and without a laboratory, is a commercial control rather than a process one.

Aggregates that are not measured in the process can also be measured quickly here and considered in the recipe — which matters for the materials that do not have a dedicated sensor on them.

Aggregate discharging from a bin gate onto a plant conveyor
Four points, one production line

Moisture changes at every stage

Sand arrives wet and variable. It gets dosed, mixed, and delivered. A reading at one point does not describe the others.

Talk to an application engineer

Not sure where to put the first sensor?

Tell us what problem you are chasing — inconsistent slump, cement overuse, wet deliveries, failed batches — and we will tell you which station to instrument first.

Houston, Texas · Most quotes answered within one business day

Response time1business day
LocationHouston, TX
SupportLifetime
TrainingIncluded
ContractNone